Table of contents X-Small Deployment for Aternity 10 (up to 5000 devices) The extra small Aternity deployment supports up to 5000 monitored devices or virtual desktops, where up to 10% of them (500) are virtual application sessions (from up to 18 virtual application servers). It supports two concurrent Aternity users, and also assumes up to five managed applications per device which monitor the application's resource usage. Small Aternity deployment Important Synchronize all Aternity components to have the same date, time AND time zone. Hardware Specifications for X-Small Deployment The extra small deployment requires the following hardware specifications: Component Minimum Memory (RAM) Minimum CPU Minimum free disk space Additional configuration Aternity Management Server 8GB Xeon E3 family 4 cores 1.9 GHz 120GB JVM heap size: (learn more) -Xmx6126m -XX:MaxNewSize=2048m ActiveMQ JVM Heap Size: 1G Aternity Dashboard Server 16GB (you can ignore the RAM size warning during setup) Xeon E5 family 8 Cores 2.4-3.6 GHz 15MB CPU cache 40GB (SSD) Or I/O per sec (IOPS): 900 For less standard hardware configurations, see the setup instructions and hardware best practices from Tableau. To deploy on a virtual machine, you must guarantee the CPU and memory requirements. Aternity Oracle Database Server 8GB Xeon E3 Family 4 Cores 2.4 GHz 250GB I/O per sec (IOPS): 600 Oracle's System Global Area (SGA): 4GB Program Global Area (PGA): 2GB If you lengthened the retention of some REST APIs (learn more), increase disk by 10GB. (Aternity upgrades only) If you reduced the retention of Performance Navigator (learn more) to just three months, reduce disk space by 170GB. For only one month's retention, reduce by 210GB. Aternity Vertica Database Server 32GB Xeon E5 family 8 Cores 2.4-3.6 GHz 15MB CPU cache 100GB (SSD) in total Or I/O per sec (IOPS): 900 The disk space is the total required for all Vertica Database Servers together in a cluster, before any high availability (k-safety = 0). For minimum high availability, we recommend at least k-safety = 1 (learn more): 3 servers x 66GB each. If you deploy on virtual machines, you MUST define all resources as dedicated or reserved (Resource Allocation > Reservation). Aternity ETL Server 8GB Xeon E5 family 2 Cores 2.4-3.6 GHz 50GB (SSD) Includes swap file: 6GB Aternity Data Source for Portal (optional) and Aternity REST API Server (optional) 8GB together, 4GB each if you separate them Xeon E3 family 2 Cores 2.4-3.6 GHz 80GB (SSD) together, 40GB (SSD) each if you separate them Optional. Only required if you use this functionality. Tip The setup checks free disk space under the logs directory (/var/log). If you are short on disk space for the setup directory, you can map this directory (soft link) to a different drive. You must also install each server with the required operating system and other software. For details, see the system and software requirements for each server. Parent topic Choose the Sizing and Hardware System Requirements of Aternity on-premise 10Related referenceTrial POC Deployment for Aternity 10 (up to 100 devices)Small Deployment for Aternity 10 (up to 20,000 devices)Medium Deployment for Aternity 10 (up to 40,000 devices)Large Deployment for Aternity 10 (up to 70,000 devices)X-Large Deployment for Aternity 10 (up to 100,000 devices)XX-Large Deployment for Aternity 10 (up to 155,000 devices) SavePDF Selected topic Selected topic and subtopics All content Related Links
X-Small Deployment for Aternity 10 (up to 5000 devices) The extra small Aternity deployment supports up to 5000 monitored devices or virtual desktops, where up to 10% of them (500) are virtual application sessions (from up to 18 virtual application servers). It supports two concurrent Aternity users, and also assumes up to five managed applications per device which monitor the application's resource usage. Small Aternity deployment Important Synchronize all Aternity components to have the same date, time AND time zone. Hardware Specifications for X-Small Deployment The extra small deployment requires the following hardware specifications: Component Minimum Memory (RAM) Minimum CPU Minimum free disk space Additional configuration Aternity Management Server 8GB Xeon E3 family 4 cores 1.9 GHz 120GB JVM heap size: (learn more) -Xmx6126m -XX:MaxNewSize=2048m ActiveMQ JVM Heap Size: 1G Aternity Dashboard Server 16GB (you can ignore the RAM size warning during setup) Xeon E5 family 8 Cores 2.4-3.6 GHz 15MB CPU cache 40GB (SSD) Or I/O per sec (IOPS): 900 For less standard hardware configurations, see the setup instructions and hardware best practices from Tableau. To deploy on a virtual machine, you must guarantee the CPU and memory requirements. Aternity Oracle Database Server 8GB Xeon E3 Family 4 Cores 2.4 GHz 250GB I/O per sec (IOPS): 600 Oracle's System Global Area (SGA): 4GB Program Global Area (PGA): 2GB If you lengthened the retention of some REST APIs (learn more), increase disk by 10GB. (Aternity upgrades only) If you reduced the retention of Performance Navigator (learn more) to just three months, reduce disk space by 170GB. For only one month's retention, reduce by 210GB. Aternity Vertica Database Server 32GB Xeon E5 family 8 Cores 2.4-3.6 GHz 15MB CPU cache 100GB (SSD) in total Or I/O per sec (IOPS): 900 The disk space is the total required for all Vertica Database Servers together in a cluster, before any high availability (k-safety = 0). For minimum high availability, we recommend at least k-safety = 1 (learn more): 3 servers x 66GB each. If you deploy on virtual machines, you MUST define all resources as dedicated or reserved (Resource Allocation > Reservation). Aternity ETL Server 8GB Xeon E5 family 2 Cores 2.4-3.6 GHz 50GB (SSD) Includes swap file: 6GB Aternity Data Source for Portal (optional) and Aternity REST API Server (optional) 8GB together, 4GB each if you separate them Xeon E3 family 2 Cores 2.4-3.6 GHz 80GB (SSD) together, 40GB (SSD) each if you separate them Optional. Only required if you use this functionality. Tip The setup checks free disk space under the logs directory (/var/log). If you are short on disk space for the setup directory, you can map this directory (soft link) to a different drive. You must also install each server with the required operating system and other software. For details, see the system and software requirements for each server. Parent topic Choose the Sizing and Hardware System Requirements of Aternity on-premise 10Related referenceTrial POC Deployment for Aternity 10 (up to 100 devices)Small Deployment for Aternity 10 (up to 20,000 devices)Medium Deployment for Aternity 10 (up to 40,000 devices)Large Deployment for Aternity 10 (up to 70,000 devices)X-Large Deployment for Aternity 10 (up to 100,000 devices)XX-Large Deployment for Aternity 10 (up to 155,000 devices)
X-Small Deployment for Aternity 10 (up to 5000 devices) The extra small Aternity deployment supports up to 5000 monitored devices or virtual desktops, where up to 10% of them (500) are virtual application sessions (from up to 18 virtual application servers). It supports two concurrent Aternity users, and also assumes up to five managed applications per device which monitor the application's resource usage. Small Aternity deployment Important Synchronize all Aternity components to have the same date, time AND time zone. Hardware Specifications for X-Small Deployment The extra small deployment requires the following hardware specifications: Component Minimum Memory (RAM) Minimum CPU Minimum free disk space Additional configuration Aternity Management Server 8GB Xeon E3 family 4 cores 1.9 GHz 120GB JVM heap size: (learn more) -Xmx6126m -XX:MaxNewSize=2048m ActiveMQ JVM Heap Size: 1G Aternity Dashboard Server 16GB (you can ignore the RAM size warning during setup) Xeon E5 family 8 Cores 2.4-3.6 GHz 15MB CPU cache 40GB (SSD) Or I/O per sec (IOPS): 900 For less standard hardware configurations, see the setup instructions and hardware best practices from Tableau. To deploy on a virtual machine, you must guarantee the CPU and memory requirements. Aternity Oracle Database Server 8GB Xeon E3 Family 4 Cores 2.4 GHz 250GB I/O per sec (IOPS): 600 Oracle's System Global Area (SGA): 4GB Program Global Area (PGA): 2GB If you lengthened the retention of some REST APIs (learn more), increase disk by 10GB. (Aternity upgrades only) If you reduced the retention of Performance Navigator (learn more) to just three months, reduce disk space by 170GB. For only one month's retention, reduce by 210GB. Aternity Vertica Database Server 32GB Xeon E5 family 8 Cores 2.4-3.6 GHz 15MB CPU cache 100GB (SSD) in total Or I/O per sec (IOPS): 900 The disk space is the total required for all Vertica Database Servers together in a cluster, before any high availability (k-safety = 0). For minimum high availability, we recommend at least k-safety = 1 (learn more): 3 servers x 66GB each. If you deploy on virtual machines, you MUST define all resources as dedicated or reserved (Resource Allocation > Reservation). Aternity ETL Server 8GB Xeon E5 family 2 Cores 2.4-3.6 GHz 50GB (SSD) Includes swap file: 6GB Aternity Data Source for Portal (optional) and Aternity REST API Server (optional) 8GB together, 4GB each if you separate them Xeon E3 family 2 Cores 2.4-3.6 GHz 80GB (SSD) together, 40GB (SSD) each if you separate them Optional. Only required if you use this functionality. Tip The setup checks free disk space under the logs directory (/var/log). If you are short on disk space for the setup directory, you can map this directory (soft link) to a different drive. You must also install each server with the required operating system and other software. For details, see the system and software requirements for each server. Parent topic Choose the Sizing and Hardware System Requirements of Aternity on-premise 10Related referenceTrial POC Deployment for Aternity 10 (up to 100 devices)Small Deployment for Aternity 10 (up to 20,000 devices)Medium Deployment for Aternity 10 (up to 40,000 devices)Large Deployment for Aternity 10 (up to 70,000 devices)X-Large Deployment for Aternity 10 (up to 100,000 devices)XX-Large Deployment for Aternity 10 (up to 155,000 devices)